Project title
Poissy offsite vertical extension
Full project title
Creation of 32 new houses on a top of a 5 floors existing building with off-site technics
Description
32 new houses on one day in a top of a 5 floors existing building: how to combine aesthetics, land conservation and construction of new houses! In 2017, Vilogia, social housing company, has launched a refurbishment program of 180 housing units in Poissy, near Paris. This project is combined with the off-site construction of 33 new wooden dwellings on the roofs! An atypical project, delivered at the end of 2017, which will enhance this emblematic heritage of the late 1950s
Where was your project implemented in the EU?
France
Ile-de-France
avenue Blanche de Castille, place Racine
48°55'19.9"North
2°01'43.3"East
Poissy
78300
When was your project implemented?
Has your project benefited from EU programmes or funds?
No
Which programme(s) or fund(s)? Provide the name of the programme(s)/fund(s), the strand/action line as relevant and the year.
II. DESCRIPTION OF THE PROJECT
Please provide a summary of your project
Vilogia planned to refurbish several social housing buildings (180 appartements) in the Beauregard district in Poissy, France. Those buildings were built in the 50’s. In order to find solution to change the aesthetics of the district, stop the artificialization of the soils and offer new housings in the same time, Vilogia developed an innovative solution: off-site vertical extension on the roof of the existing building. This project proposes a contemporary rewriting of buildings and extends their history and that of the tenants. Wood enriches the environment with new silhouettes that stand out against the roofs of three buildings in the Beauregard district. The modules are manufactured in the workshop. They are prefabricated and fully finished in the factory, the housing units are made from a timber frame: they were designed specifically for the project. The use of wood and "tailor-made" industrialization allow great adaptability: -Dimensions adapted to the existing -Personalized interior layout -Choice of suitable materials to the site context -Roofs prefabricated and assembled on site. Other factory elements enrich the project: -Private terraces made to measure -New balconies... The houses are made up of 3 or 4 modules depending on number of bedrooms (bedroom module, living room module and wet room module); they were designed specifically for the project. The modules benefit from the quality of finish linked to workshop work: interior paints, sanitary ware, floor finishes, interior and exterior joinery, cladding. The new houses, compliant with the French regulation for new buildings were easily put on the existing roof only in 3 hours with a crane and the project was completely delivered at the end of 2017!
Please give information about the key objectives of your project in terms of sustainability and how these have been met
The 32 new appartements located on the roof are completely compliant with the French energy regulation. The use of wooden frame reduces tremendously the carbon impact of the construction. The vertical extension avoids the artificialization of the surrounding lands. Factory production greatly reduces the use of materials and avoids wasting resources. The prefabrication of the modules in a factory reduces by 90% the use of cars for the worksite and reduce the carbon emission of the worksite stage.
Please give information about the key objectives of your project in terms of aesthetics and quality of experience beyond functionality and how these have been met
A few hundred meters from the Seine and the Villa Savoye (designed by LeCorbusier), the 3 buildings in R + 4 (Blanche de castille, Foucauld and Ronsard) belong to a group built in 1957 to meet the needs of the activity of the Simca automobile factories. The simplicity and quality of the initial design by architect Gustave Stoskopf, “Grand Prix de Rome”, resulted in the creation of 1,500 housing units. Beyond the environmental aspect, this project proposes a contemporary rewriting of buildings and extends their history and that of the tenants. Wood enriches the environment with new silhouettes that stand out against the roofs of three buildings in the Beauregard district. The project changes the architectural qualities of the buildings and its perception from the public space. The elevation allows houses to appear on the roof in a collective ensemble with rather harsh lines.
Please give information about the key objectives of your project in terms of inclusion and how these have been met
Before, during and after the worksite stage a presentation of the project was done. A project manager liaised during all the worksite stage with the tenants of the building. In addition to the vertical extension, some terraces were created on the roofs and balconies in wooden frames were manufactured in the factory. Those elements provided to all tenants a private external additional space. The new houses are compliant with the access for elderly people and disabled people.
Please give information on the results/impacts achieved by your project in relation to the category you apply for
The project of Beauregard demonstrated the utility of the new off-site construction. So far in France, just a few projects are designed with off-site technics and lots of them focused on full new construction. The project of Beauregard in the city of Poissy uses the off-site technics for refurbishment. Digitals tools were used (BIM) to tailor the new houses to the dimensions of the existing buildings. The modules are made in optimal conditions. In the workshop in a stable and comfortable environment, each work is carried out by optimizing the tasks allowing an efficient quality control for a high level of finish. The installation of the houses on the roof takes only a few hours using a crane. It would be impossible to create new houses on a vertical extension without the off-site technique.
Please explain the way citizens benefiting from or affected by the project and civil society have been involved in the project and what has been the impact of this involvement on the project
The Poissy retrofitting and extension project allows everyone to benefit from the architectural change in the neighborhood. The addition of houses on the roofs and the integration of new balconies show to all the inhabitants of the district and to all passers-by that it is possible at the same time to densify a site, to spare the lands and to improve the aesthetics of a neighborhood. The tenants of the new housing will also be the first ambassadors of this transformation. This global real estate project demonstrates the utility of off-site construction techniques.
Please highlight the innovative character of the project
The off-site, design to cost, lean and DFMA methods allow to develop a product approach to limit the artificialization of the soil but at the same time offering new homes. The 3D module manufactured system is often use for brand new building. In this project, the innovative aspect is to use this technic to enhance the architecture of existing building and offers new amenities to the tenants (terraces and balconies).
Please explain how the project led to results or learnings which could be transferred to other interested parties
Thanks to the industrial approach, the product development approach and the implementation of continuous improvement quality process, it is possible to use again the same method for thousands dwellings! The goal is to develop the same method as the automotive sector. Even if the modules are tailored to the existing building, the method can be easily replicated for the vertical extension of other buildings. Vilogia has identified 10 different sites near Lille to test similar solution with 2D or 3D wooden frame modules.
Is an evaluation report or any relevant independent evaluation source available?
No
III. UPLOAD PICTURES
IV. VALIDATION
By ticking this box, you declare that all the information provided in this form is factually correct, that the proposed project has not been proposed for the Awards more than once under the same category and that it has not been subject to any type of investigation, which could lead to a financial correction because of irregularities or fraud.
Yes

Attention

In order to submit your project, please make sure you have filled in all the mandatory fields marked with *, in both the “Basic information” and “Description of the project” tabs.

Attention

The country you have selected is not a Member State of the EU.

Please select the country your project was either implemented in the EU for Strand A in or is being developed or intended to be implemented in the EU for Strand B.